Completed The Habitat Bình Dương apartments — move in or rent out right away
The six phase 3 towers right at the gate of VSIP 1 passed completion acceptance on 1 April 2025, and 2–3 bedroom apartments are handed over with basic finishes. Choose fast payment: 50% on signing the agreement and receiving the keys, with combined incentives of 7%. The project is surrounded by VSIP 1 and Song Than industrial parks — the area's main source of apartment tenants.
- From VND 3.58 billion
- 2-bedroom, 72.6 m², incl. VAT (price list of 3 April 2026)
- 04/2025
- Completion acceptance of the six phase 3 towers
- 50 m pool
- Infinity pool on the 3rd floor of the podium

The Habitat Bình Dương Prices
Updated 15 Oct 2026
List prices per the developer's phase 3 price list of 3 April 2026, for the units remaining in the inventory list HPR has received:
| Unit type | Net area | Price excl. VAT | Price incl. VAT |
|---|---|---|---|
| 2 bedrooms | 70.6–77.1 m² | VND 3.26 – 3.99 billion | VND 3.58 – 4.39 billion |
| 3 bedrooms | 88–92.7 m² | VND 4.13 – 4.31 billion | VND 4.54 – 4.73 billion |
Prices exclude the 2% maintenance fee (paid before receiving the apartment). VAT is calculated on the sale price minus the land use right value.
Example unit: 2-bedroom unit D1.1307, 72.6 m² net, facing south-east — list price VND 3.26 billion excl. VAT (VND 3.58 billion incl. VAT). With the fast payment plan and total incentives of 7%, the price excl. VAT comes to about VND 3.03 billion.
That is about VND 45–52 million/m² of net area (excl. VAT) for a completed apartment with a project land certificate, in a community with a 50 m pool and a park, next to VSIP 1 and Aeon Mall. Buyers can view the actual unit and the amenities already operating in phases 1 and 2 before deciding.
Price & loan calculator
Prices and offers change from time to time. Please contact our consultants for exact, up-to-date prices and offers.
Banks Supporting Home Loans for The Habitat Bình Dương
As the apartments are completed, banks appraise and disburse against the apartment itself. Three lending policy letters have been issued specifically for the project:
TPBank — loans up to 70%, 25 years
Notice of 18 February 2025 (Go Vap branch): up to 70% of the appraised value, principal grace period of up to 24 months; fixed rate of 6.6%/year for the first 12 months, 7.1% for 18 months or 7.6% for 24 months, then the base rate + 3%.
Public Bank — loans up to 80%
Offer letter of 16 December 2025: up to 80% (90% for borrowers under 35), terms of 6–30 years, principal grace period of up to 18 months; 6.4%/year for the first year, 7.2% for 2 years or 8.0% for 3 years, then a margin of 3.25–3.5% + the 18-month savings rate.
Vietcombank, BIDV, Shinhan
Vietcombank (Tan Dinh, Binh Duong), BIDV (VSIP 1, Nam Binh Duong) and Shinhan also accept loan applications for apartments in the project — HPR connects you with the responsible bank officer.
Example: a 2-bedroom unit at VND 3.58 billion (incl. VAT), borrowing 70% ≈ VND 2.51 billion over 20 years at 6.6%/year in the first year: the first monthly payment is about VND 24.2 million (fixed principal of VND 10.4 million + interest of VND 13.8 million), decreasing as the balance falls. Figures are for reference only — the rate floats after the promotional period.
The Habitat Bình Dương Sales Policy
Effective from 24 Mar 2026Updated 15 Oct 2026
The developer's payment plans and incentive programme apply from 24 March 2026 until further notice. A deposit of VND 50 million is paid when signing the deposit agreement, by bank transfer directly to the developer's account; the deposit is deducted from the first installment.
Plan 1 — spread until 2027
10% on signing the sale and purchase agreement, then 10% at each of the following milestones: 15 July 2026, handover on 15 September 2026, 15 December 2026, 15 March 2027 and 15 May 2027; 35% on 15 July 2027; 5% on receiving the certificate. Total incentives 6%.
Plan 2 — fast payment
50% on signing the sale and purchase agreement and receiving the apartment, 45% within 1 month, 5% on receiving the certificate. Total incentives 7%.
Combined incentives up to 7%
1% for signing the deposit agreement or the purchase agreement within 10 days of the deposit; a 3% interior finishing package; 1% (plan 1) or 2% (plan 2); a 1% handover incentive. All are deducted directly from the price excl. VAT.
2% maintenance fee
Payable from the date of the handover notice until before receiving the apartment.
The Habitat Bình Dương Legal Documents
Updated 18 Oct 2026
Legal name: Habitat Binh Duong Apartment Complex – phase 3 (6 towers C1, C2, C3, D1, D2, D3), developed by VSIP – Sembcorp Gateway Development Co., Ltd.
Foreign buyers: according to the list published by the Ho Chi Minh City Department of Construction (CafeF, Bao Phap luat Viet Nam, 12 October 2026), the Habitat Binh Duong Apartment Complex phase 3 is on the list of projects in which foreign organisations and individuals are permitted to own housing; 151 apartments have been sold to foreign organisations and individuals under sale and purchase agreements, based on the approval of the former Binh Duong Department of Construction in letter 2348/SXD-QLN dated 23 May 2025. The note "not yet sold to foreigners" in document 405/SXD-QLN reflects the situation as of 23 January 2025.
Investment Registration Certificate for the Habitat Binh Duong Apartment Complex project
First issued on 1 November 2013, 5th amendment on 30 September 2024. The copy contains personal data of the legal representative and is therefore not published — contact us to view it.
Decision approving the partial transfer of the VSIP Real Estate project (Mixed-use Complex)
Decision approving the partial adjustment of the 1/500 detailed plan of the Binh Hoa Ward Mixed-use Complex
Adjusts the 1/500 plan approved under Decision 2395/QĐ-UBND dated 30 August 2012.
Certificate of land use rights, ownership of housing and other assets attached to land
Plot 671, map sheet 30 (DC3), 18,121 m² of urban residential land, valid until 1 November 2063; land allocated by the State with land use fees.
Construction permit for the Habitat Binh Duong Apartment Complex – phase 3
1 podium and 6 apartment towers, 793 apartments, height 65.9 m.
Notice that off-plan housing is eligible for sale
651/793 phase 3 apartments are eligible for sale. The project is mortgaged at Vietcombank – Tan Dinh Branch; at the time of the document, the project had not yet been sold to foreign organisations or individuals.
Notice of inspection results of the completion acceptance of the construction works
Approves the completion acceptance results of the Habitat Binh Duong Apartment Complex – phase 3.
Copies provided by the developer for reference. The originals are held by the developer. Attached documents are the original Vietnamese versions.
Buying a Completed Unit at The Habitat Bình Dương: What to Weigh
Updated 20 Oct 2026
Points to review before you commit, so you can compare them with your own financial plan.
Legal status, step by step
The project land has certificate CK 648839 (urban residential land, in use until 1 November 2063), construction permit 4076/GPXD, eligibility-for-sale notice 405/SXD-QLN and completion acceptance notice 42/GĐ-DDCN/HT dated 1 April 2025.
Cash flow when buying
Fast payment: 50% on signing the agreement and receiving the keys, 45% within 1 month, 5% on receiving the certificate — combined incentives of 7%. Or take a loan: TPBank up to 70%, Public Bank up to 80% of the appraised value.
Rental demand around the area
The project is right at the gate of VSIP 1 and close to Song Than industrial park — workplaces for many expatriate professionals. Phase 3 is on the list of projects in which foreign organisations and individuals are permitted to own housing.
An operating community
Savills manages operations; phases 1 and 2 have handed over 727 units. A 50 m pool, a park, amenities at no extra charge and a gated community — you can see the amenities in operation before you buy.
When you want to resell or rent out
After handover, you can consign your property for resale or rent with HPR: HPR verifies the documents, surveys the property, advises on the asking price, then markets it and shows it to prospective buyers or tenants.
Risks to check for yourself
Units are handed over with basic finishes: budget for air conditioners, lights, water heaters and furniture before renting out. Payment method 1 has milestones that have already passed, pending an update from the developer. There is no document yet on the phase 3 management fee. Binh Hoa Ward was affected by high tides in October 2025 — see the area for yourself (how to check).
The Habitat Bình Dương Location — Huu Nghi Boulevard, VSIP 1
The Habitat Bình Dương is located at 8 Huu Nghi Boulevard, right at the gate of the Vietnam – Singapore Industrial Park (VSIP 1), Binh Hoa Ward (formerly Thuan An). Huu Nghi Boulevard connects directly to National Highway 13 — the main route between former Binh Duong and central Ho Chi Minh City.
Travel times according to the developer's materials:
- 2 minutes: Aeon Mall Binh Duong, Song Be Golf Course.
- 7 minutes: Becamex International Hospital, Lotte Mart.
- 10 minutes: Lai Thieu Market, Columbia Asia International Hospital.
- 20 minutes: Binh Duong New City.
- 35 minutes: Tan Son Nhat Airport, central Ho Chi Minh City, Dai Nam Tourist Park.
The surrounding VSIP 1 and Song Than industrial parks employ many foreign specialists, who are the main source of apartment tenants in the area.
The Habitat Bình Dương Construction Progress
Updated 15 Oct 2026

- Completed
01/2022 — Groundbreaking
Commencement notice 01/2022/TB-GW dated 14 January 2022, under construction permit 4076/GPXD.
- Completed
06/2022 — Foundation acceptance
The Southern Operations Department (Ministry of Construction) inspected the acceptance of the piles, foundations and basement slab — document 275/CPN-QLXD dated 15 June 2022.
- Completed
11/2023 — Superstructure acceptance
Notice 1289/GĐ-DDCN dated 3 November 2023 of the State Agency for Construction Quality Inspection.
- Completed
01/2025 — Eligible for sale
The Binh Duong Department of Construction confirmed 651/793 units eligible for sale (405/SXD-QLN dated 23 January 2025); at the site inspection on 16 January 2025, the superstructure of all 6 towers was complete and basic infrastructure was finished.
- Completed
04/2025 — Completion acceptance
The State Agency for Construction Quality Inspection approved the completion acceptance results (42/GĐ-DDCN/HT dated 1 April 2025); fire safety acceptance under document 129/NT-PCCC dated 26 February 2025.
- In progress
Signing and handover
Sign the sale and purchase agreement and receive the apartment according to the chosen payment plan.
- Upcoming
Certificate issuance
The final 5% is paid on receiving the apartment ownership certificate.
The Habitat Bình Dương Project Overview
The Habitat Bình Dương (legal name: Habitat Binh Duong Apartment Complex) has 3 phases and 11 towers on a site of about 4 ha. Phase 1 (2 towers, 267 units) and phase 2 (3 towers, 460 units) have been handed over; phase 3 comprises the last 6 towers, which were completed and accepted as completed on 1 April 2025.
- Commercial name
- The Habitat Bình Dương — phase 3 (towers C1, C2, C3, D1, D2, D3)
- Address
- 8 Huu Nghi Boulevard, VSIP 1, Binh Hoa Ward, Ho Chi Minh City (formerly Thuan An City, Binh Duong)
- Developer
- VSIP – Sembcorp Gateway Development Co., Ltd. (tax code 3702228917)
- Project sponsors
- a joint venture of VSIP, Sembcorp Properties (Sembcorp Industries, Singapore) and MC Development Asia (Mitsubishi Corporation, Japan)
- Main contractor
- CC1
- Architecture and landscape design
- BYG
- Property management
- Savills
- Phase 3 land area
- 18,121 m² · Building density: 46.38%
- Phase 3 scale
- 6 towers, 793 apartments; 1 basement, 3-storey podium + mezzanine, 15-storey towers (D3: 13 storeys); 7–10 units per floor
- Unit types
- 1-bedroom, 2-bedroom, 3-bedroom, duplex — about 51–137 m² net area; every unit has a drying yard
- Legal status
- land use right certificate CK 648839, urban residential land, valid until 1 November 2063; construction permit 4076/GPXD; eligibility-for-sale notice 405/SXD-QLN
- Completion
- accepted as completed under notice 42/GĐ-DDCN/HT dated 1 April 2025
- Handover standard
- basic finishes (kitchen, sanitary ware, flooring, doors; excluding air conditioners, lights and water heaters)

The Habitat Bình Dương Apartment Types
Areas are taken from the developer's drawings: net (usable) / gross area. Every unit has its own drying yard; many also have a living-room loggia.

2-bedroom 72.6 m² — type B1g
72.6 m² net / 78.9 m² gross, tower D1 position 07 (floors 2–18). Living, dining and kitchen along one long axis, 2 bathrooms. Suits a young family of 3–4.

2-bedroom 77.1 m² with loggia — type B6
77.1 m² net / 83.7 m² gross, tower D2 position 08 (floors 5–18). Loggia off the living room, with a separate drying yard behind the kitchen.

3-bedroom 88 m² — type C5
88 m² net / 95.9 m² gross, corner unit in tower D1 position 01. Living-room loggia and 2 bathrooms — enough room for a three-generation family.

3-bedroom 92.7 m² — type C4
92.7 m² net / 99.5 m² gross, tower D3. All three bedrooms face the open side, with a loggia next to the living room.

Duplex 136.6 m² — type DP-C3
136.6 m² net (91.5 + 45.1 m²) over 2 floors, 3 bedrooms; double-height living room about 6 m high. Limited numbers — ask a consultant about available units.
Handover — basic finishes
Thien Tu porcelain tile flooring, Nippon paint; An Cuong kitchen cabinets, induction hob, range hood and sink by Hafele; Rigel sanitary ware; 60-minute fire-rated entrance door with Yale fittings; Kadaas smart locks (towers D1–D3); Hager switches, Schneider circuit breakers, Aiphone door intercom. Living room and bedroom ceilings 2.9 m high. Excludes air conditioners (copper piping pre-installed), lights and water heaters.
The Habitat Bình Dương Floor Plans
Phase 3 consists of two rows of towers: C1, C2, C3 to the north and D1, D2, D3 to the south, wrapping around the pool and plaza on the podium. The C row is about 29 m from towers D1 and D2; each floor has only 7–10 units.
The Habitat Bình Dương Amenities
Phase 3 has an amenity deck of more than 4,000 m² on the podium and a ground-level park connected to phases 1 and 2. Residents use the amenities free of charge; the community is gated and closed to outsiders.
The 50 m pool, the park and the community-wide management system are an advantage when renting to industrial park specialists, compared with stand-alone apartment buildings nearby.
The Habitat Bình Dương 3D Show Unit Tour
Walk through every room of the 3-bedroom show unit on your phone or computer.

Open full screenDrag to look around, scroll or pinch to zoom. Source: the developer's 360° tour.
The Habitat Bình Dương FAQ
Updated 18 Oct 2026
Land use right certificate CK 648839 (21 February 2020), construction permit 4076/GPXD (6 December 2021), eligibility-for-sale notice 405/SXD-QLN (23 January 2025) and completion acceptance notice 42/GĐ-DDCN/HT (1 April 2025).
According to the price list of 3 April 2026, 2-bedroom unit D1.1307 of 72.6 m² is listed at VND 3.26 billion excl. VAT (VND 3.58 billion incl. VAT). With fast payment and combined incentives of 7%, the price excl. VAT comes to about VND 3.03 billion, excluding the 2% maintenance fee. Contact an HPR consultant for exact prices and incentives for each unit.
Fast payment (method 2) earns combined incentives of 7%: 50% on signing the agreement and receiving the keys, 45% within 1 month, 5% on receiving the certificate. Method 1 spreads payments until 2027 with a 6% incentive — a consultant will confirm the schedule for each instalment when you sign. If you take a loan, the apartment is already completed, so the bank appraises the unit itself: TPBank up to 70%, Public Bank up to 80%. An HPR consultant will send you a stage-by-stage cash-out comparison for the unit you choose.
Phase 3 passed completion acceptance on 1 April 2025. With method 2, you receive the keys when you sign the sale and purchase agreement. Units are handed over with basic finishes, excluding air conditioners, lights and water heaters — budget for these and for furniture before renting out.
According to the list published by the Ho Chi Minh City Department of Construction (CafeF, Bao Phap luat Viet Nam, 12 October 2026), the Habitat Binh Duong Apartment Complex phase 3 is on the list of projects in which foreign organisations and individuals are permitted to own housing. The list records 151 apartments sold to foreign organisations and individuals under sale and purchase agreements, based on the approval of the former Binh Duong Department of Construction in letter 2348/SXD-QLN dated 23 May 2025. The number of units still available to foreign buyers changes over time — ask a consultant before choosing a unit.
After handover, you can consign your property for resale or rent with HPR. HPR surveys the property and advises on an asking price based on the market at the time of consignment; HPR does not commit to a selling time, sale price or rent. Owners in phases 1 and 2 can also consign via the form at the bottom of the page.
The project's land use right certificate states urban residential land with a land use term until 1 November 2063. The apartment ownership term is stated on the certificate issued for each unit — an HPR consultant will send you the developer's written response.
TPBank (up to 70%, 25 years), Public Bank (up to 80%, 30 years), Vietcombank, BIDV, Shinhan. First-year promotional rates from 6.4%/year according to the banks' offer letters.
VSIP – Sembcorp Gateway Development Co., Ltd. (tax code 3702228917), a joint venture between VSIP and GW Residences (Sembcorp Properties, MC Development Asia – Mitsubishi). The sale and purchase agreement is signed directly with the developer.
VND 50 million when signing the deposit agreement, by bank transfer to the developer's account at Vietcombank; the deposit is deducted from the first instalment.
Basic finishes: porcelain flooring, An Cuong kitchen cabinets, Hafele induction hob, range hood and sink, Rigel sanitary ware, fire-rated entrance door, smart lock (D towers). Excludes air conditioners (piping pre-installed), lights and water heaters.
Residents use the pool, gym and park at no extra charge; non-residents may not use them. Phase 3 parking fees will be announced by the management board (phase 2 for reference: indoor car parking VND 900,000/month, motorbikes VND 110,000/month).
According to VOV (October 2025), the high tide that peaked at 1.87 m on the night of 24 October 2025 affected many wards along the Saigon River, including Binh Hoa; the article does not mention Huu Nghi Boulevard. According to Sai Gon Giai Phong (October 2024), the Binh Hoa drainage improvement and upgrade project has been put into use, resolving flooding for a catchment of nearly 2,900 ha, especially VSIP 1 industrial park. HPR has no document from the developer on the ground elevation and drainage system of phase 3. We recommend visiting the area after heavy rain and at high tide, and asking the developer to answer in writing on the ground elevation and basement. See also: How to check flooding and high tides when choosing a project.
Get advice on The Habitat Bình Dương with HPR
HPR consultants help you choose an available unit at The Habitat Bình Dương, check the legal documents and prepare your paperwork through to handover.
- Information backed by documentsEvery price, policy and legal document HPR sends states the date and the developer source; the deposit is transferred directly to the developer's account.
- View real unitsBook a visit to the show unit and handed-over units at the project, 8 Huu Nghi Boulevard.
- Loan application supportWe connect you with TPBank, Public Bank, Vietcombank, BIDV and Shinhan, and compare loan ratios and promotional rates based on your income.
Get the The Habitat Bình Dương Price List & Cash-Flow Sheet
Leave your phone number and an HPR consultant will send you prices of the available units and book a visit to a real unit for you. HPR does not collect any holding fee — the deposit is transferred directly to the developer.
or contact us directly
Your information is used only for HPR to contact you. By submitting, you agree to our Privacy Policy.



























